Built in Our Own Factories
From raw steel to finished hardware — every product is designed, forged, tested, and documented in our integrated production campus in Hebei Province, China.
Integrated Manufacturing Campus
Our production facility spans 50,000 square metres and houses eight specialized workshops under one management system. This integration eliminates supply chain risk, ensures consistent quality, and enables rapid turnaround on custom orders.
Unlike trading companies, we own and operate every step of the manufacturing process — from raw material procurement and forging to surface treatment, assembly, and final testing. This gives buyers full traceability and direct accountability.
8 Specialized Production Lines
From Raw Material to Finished Product
In-House Testing Laboratory
Our QA laboratory is equipped to perform the full range of tests required by IEC, GB/T, and customer specifications — without relying on third-party labs for routine testing.
- Mechanical load testing up to 500 kN — tension, compression, and torsion
- High-voltage dielectric testing up to 500 kV AC for composite insulators
- Zinc coating thickness measurement by magnetic induction gauge
- Coordinate measuring machine (CMM) for critical dimensional verification
- Salt spray corrosion testing chamber — 1,000 hours per IEC 60068
- Spectrometer for raw material chemical composition verification
Annual Output by Product Category
Our integrated campus supports high-volume orders with consistent lead times. Contact us for project-specific capacity allocation.
| Product Category | Annual Capacity | Standard Lead Time | Min. Order |
|---|---|---|---|
| Steel Hardware Fittings | 5,000 metric tons | 15–25 days | 100 pcs |
| Composite Insulators | 500,000 units | 20–30 days | 50 pcs |
| Suspension / Strain Clamps | 2,000 metric tons | 15–20 days | 200 pcs |
| Aluminium Alloy Fittings | 1,000 metric tons | 20–25 days | 100 pcs |
| Composite Utility Poles | 50,000 units | 25–35 days | 20 pcs |
| Personal Protection Equipment | 100,000 sets | 10–20 days | 50 sets |
| Custom / OEM Products | Project basis | 30–45 days | By drawing |
Continuous Product Innovation
Tour Our Factory or Request a Sample
We welcome factory visits, third-party inspections, and sample orders. Contact our sales team to arrange a visit or request a product sample for your evaluation.
